Full bathroom renovationsin Cardiff & South Wales

End-to-end refits across Cardiff, Newport and the surrounding boroughs. Strip-out, first fix plumbing, tiling, second fix, plastering and decoration, with one team carrying every trade across the door.

Most bathroom renovations fall apart at the seams between trades. The plumber blames the tiler, the tiler blames the plasterer, and the homeowner is left chasing dates. Sycamore does it differently. The plumbing, tiling, plastering, and finish are all done by the same small team, in the right order, with no gaps.

A full renovation typically runs to 10 to 14 working days for a standard family bathroom and 14 to 20 days for an en-suite plus master combination. We start with a strip-out, agree the layout on the floor with masking tape, and only then commit to first fix. Once first fix is signed off, we move to plastering, tiling and second fix.

Designed for clients renovating their forever bathroom, restoring period properties, fitting walk-in showers in older homes, or rebuilding a botched job from a previous trade. We carry insurance, references, and a portfolio of finished work locally.

How a full bathroom renovations job runs.

Every job is run the same way: same team, same trades, same approach. The notes below are how we think about full bathroom renovations specifically.

i.

One team, one number

You speak to Simon for the quote and to Morgan on site. No subcontracting, no gaps between trades.

ii.

Tile to tap

First fix plumbing, tiling, plastering, second fix and decoration all carried by the same team.

iii.

Right materials, right order

Hidden waste runs, soundproofing in joists, properly bedded trays. The detail you only see when something goes wrong with a cheap fit.

iv.

Tidy on site

Floors covered, dust contained, end-of-day sweep. Living in the house during the work is normal for our clients.

A few full bathroom renovations jobs.

Pulled from the last few months across Cardiff, Newport and the boroughs. Hover for a one-line note on the project.

Ready to plan a full bathroom renovations?

Call Simon for an initial chat, or send a couple of photos of the space and Sycamore will come back with a quote the same week.

Frequently asked.

How long does a bathroom renovation take?
A standard family bathroom is 10 to 14 working days. En-suites or wet rooms with structural changes can run to 18-20.
Do you supply the bathroom suite?
We can. Most clients order the suite themselves once they have the layout signed off, but we can supply through trade if you prefer one invoice.
Can we still use the house?
Yes. We seal off the bathroom, run dust sheets through the property, and clean the route at the end of every day.
Do you remove old waste?
Yes. The old suite, tile, plaster waste and packaging all leave the site. We do not leave a skip on the road unless agreed.

Let's talk about the space.

A few photos and a sketch of the room is usually enough for a first quote. For anything structural or tricky, we come and look.

Office Landline02921 202 001
Mobile07832 288 991
Email